By: 红桃视频 Staff//April 30, 2024//
PROJECT: Modera Woodstock Apartments
LOCATION: 4804 S.E. Woodstock Blvd., Portland
SIZE: 183,755 square feet (five stories plus underground garage)
START DATE: September 2022
ANTICIPATED COMPLETION DATE: fall 2024
COST: undisclosed
OWNER/DEVELOPER: Mill Creek Residential Trust (MCRT)
GENERAL CONTRACTOR: MCRT PNW
ARCHITECT: Leeb Architects
ENGINEERS: Humber Design Group (civil), KPFF (structural)
OTHER ASSOCIATES: Shapiro Didway (landscape design), Vida Design (interiors)
PROJECT DESCRIPTION: This five-story, podium-style building will hold 194 apartments 鈥 studios, one-bedroom units, loft units, and four-bedroom units. The ground floor will hold 6,500 square feet of street-facing retail space.
Building amenities will include a clubhouse, landscaped courtyards, a rooftop deck with a grilling area and a fire pit, a game room, a mini theater room, a coffee bar, a pet spa, and a 24-hour fitness studio. The building will also have dedicated bike storage and a bike repair station. The secure parking garage will have 114 spaces, including charging stations for electric vehicles.
Apartment interiors will include nine-foot ceilings, wood-plank-style flooring and stainless-steel appliances. A Leadership in Energy and Environmental Design gold rating will be sought for the project.
鈥淏uilding Blocks鈥 spotlights noteworthy projects either under construction or approaching the start of construction. To submit a project for consideration, please visit: djcoregon.com/building-blocks.